Skip to Content

TRAIL HEAD MASTER PLAN

MILTON QUARRY, MILTON, ON

DUFFERIN AGGREGATES

RECREATIONAL TRAIL DEVELOPMENT

2004

N/A

 

The Trail Head Master Plan for the Milton Quarry was developed by MHBC to illustrate a concept for the future quarry restoration to the local conservation authority.

 

Shown here is a portion of one of three concepts that were developed and refined for presentation to Conservation Halton. The plan illustrates in concept the main entrance areas for the future park and interpretive areas which will emerge once the quarry is no longer in operation.

 

Future plans for the site include a park, complete with internal trail systems connecting to the Bruce Trail, picnic areas with public facilities, and a man-made lake and beach.

 

Download Project Sheet

Back to top